{"id":51432,"date":"2026-01-13T15:56:57","date_gmt":"2026-01-13T12:56:57","guid":{"rendered":"https:\/\/ayyildizgundem.net\/?p=51432"},"modified":"2026-01-13T15:56:57","modified_gmt":"2026-01-13T12:56:57","slug":"fethiye-oludeniz-guzergahi-bastan-sona-yenileniyor","status":"publish","type":"post","link":"https:\/\/ayyildizgundem.net\/index.php\/2026\/01\/13\/fethiye-oludeniz-guzergahi-bastan-sona-yenileniyor\/","title":{"rendered":"FETH\u0130YE\u2013\u00d6L\u00dcDEN\u0130Z G\u00dcZERG\u00c2HI BA\u015eTAN SONA YEN\u0130LEN\u0130YOR"},"content":{"rendered":"<p>Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi, Fethiye-\u00d6l\u00fcdeniz yolunda 328 milyon TL\u2019lik yat\u0131r\u0131mla y\u00fcr\u00fctt\u00fc\u011f\u00fc yol ve altyap\u0131 \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda ikinci etap Ovac\u0131k\u2013\u015fehir i\u00e7i g\u00fczerg\u00e2h\u0131nda \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-51433 size-full\" src=\"https:\/\/ayyildizgundem.net\/wp-content\/uploads\/2026\/01\/WhatsApp-Image-2026-01-13-at-15.13.55_600x400.jpeg\" alt=\"\" width=\"600\" height=\"400\" \/><\/p>\n<p>Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi\u2019nin Fethiye\u2013\u00d6l\u00fcdeniz b\u00f6lgesinde ba\u015flatt\u0131\u011f\u0131 yol, altyap\u0131 ve \u00e7evre d\u00fczenleme \u00e7al\u0131\u015fmalar\u0131, b\u00f6lgede b\u00fcy\u00fck bir d\u00f6n\u00fc\u015f\u00fcmle devam ediyor. 328 milyon TL\u2019lik yat\u0131r\u0131mla y\u00fcr\u00fct\u00fclen \u00e7al\u0131\u015fmalar kapsam\u0131nda birinci etap Patlang\u0131\u00e7\u2013Ovac\u0131k, \u00fc\u00e7\u00fcnc\u00fc etap Hisar\u00f6n\u00fc\u2013\u00d6l\u00fcdeniz ve d\u00f6rd\u00fcnc\u00fc etap \u00d6l\u00fcdeniz\u2013Kayak\u00f6y yolunda asfalt \u00e7al\u0131\u015fmalar\u0131 tamamland\u0131. \u0130kinci etap Ovac\u0131k\u2013\u015fehir i\u00e7i g\u00fczerg\u00e2h\u0131nda ise \u00e7al\u0131\u015fmalar t\u00fcm h\u0131z\u0131yla devam ediyor.<\/p>\n<p>Genel proje kapsam\u0131nda 11 bin metre s\u0131cak asfalt serimi, 4 bin 200 metre i\u00e7me suyu hatt\u0131, 7 bin metre ya\u011fmursuyu hatt\u0131 ve 4 bin 500 metre \u00e7elik otokorkuluk yap\u0131m\u0131 yer al\u0131yor.<\/p>\n<p><strong>\u0130K\u0130NC\u0130 ETAPTA \u00c7ALI\u015eMALAR DEVAM ED\u0130YOR<\/strong><\/p>\n<p>\u0130kinci etap Ovac\u0131k\u2013\u015fehir i\u00e7i kapsam\u0131nda; 7 bin metre uzunlu\u011funda ya\u011fmur suyu hatt\u0131, kald\u0131r\u0131m d\u00fczenlemeleri, 3 bin 500 metre s\u0131cak asfalt serimi, istinat duvar\u0131 yap\u0131m\u0131 ve d\u00f6nel kav\u015fak d\u00fczenlemeleri ile 500 metre otokorkuluk yap\u0131l\u0131yor.<\/p>\n<p><strong>B\u0130R\u0130NC\u0130, \u00dc\u00c7\u00dcNC\u00dc VE D\u00d6RD\u00dcNC\u00dc ETAP \u00c7ALI\u015eMALARI TAMAMLANDI<\/strong><\/p>\n<p>Tamamlanan birinci etap Patlang\u0131\u00e7\u2013Ovac\u0131k \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda 2 bin 500 metre pmt serimi, bit\u00fcml\u00fc temel serimi, binder serimi, 2 bin 100 metre otokorkuluk ve 300 metre bord\u00fcr imalat\u0131 yap\u0131ld\u0131. Ortalama yol geni\u015fli\u011fi 15 metre oldu.<\/p>\n<p>Projenin \u00fc\u00e7\u00fcnc\u00fc etab\u0131 Hisar\u00f6n\u00fc\u2013\u00d6l\u00fcdeniz\u2019de ise 2 bin 650 metre BSK ve pmt serimi, bin 173 metre otokorkuluk, 2 bin 200 metre i\u00e7me suyu hatt\u0131, 2 bin 730 metre bord\u00fcr, bin 865 metrekare parke ve 2 bin 550 metre hendek beton kaplama \u00e7al\u0131\u015fmalar\u0131 tamamland\u0131. Birinci ve \u00fc\u00e7\u00fcnc\u00fc etap \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda 3 bin metre motorcu dostu bariyer yap\u0131ld\u0131.<\/p>\n<p>D\u00f6rd\u00fcnc\u00fc etap \u00d6l\u00fcdeniz\u2013Kayak\u00f6y yolundaki \u00e7al\u0131\u015fmalar kapsam\u0131nda 2 bin metrelik 200\u2019l\u00fck duktil i\u00e7me suyu hatt\u0131n\u0131n imalat\u0131, 2 bin 500 metre s\u0131cak asfalt \u00e7al\u0131\u015fmas\u0131, kald\u0131r\u0131m, ya\u011fmursuyu hatt\u0131 \u00e7al\u0131\u015fmalar\u0131 tamamland\u0131. Bin metre otokorkuluk ve hendek betonu \u00e7al\u0131\u015fmalar\u0131 devam ediyor.<\/p>\n<p><strong>BA\u015eKAN ARAS: \u201c\u00d6L\u00dcDEN\u0130Z\u2019E YAPTI\u011eIMIZ YATIRIM, YA\u015eAM KAL\u0130TES\u0130N\u0130 Y\u00dcKSELTEN B\u00dcT\u00dcNC\u00dcL B\u0130R D\u00d6N\u00dc\u015e\u00dcM PROJES\u0130D\u0130R\u201d<\/strong><\/p>\n<p>K\u0131y\u0131 Ege Belediyeler Birli\u011fi ve Mu\u011fla B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkan\u0131 Ahmet Aras, projeye ili\u015fkin yapt\u0131\u011f\u0131 a\u00e7\u0131klamada \u015fu ifadelere yer verdi: \u201cMu\u011fla\u2019m\u0131z\u0131 gelece\u011fe haz\u0131rlarken \u00f6nceli\u011fimiz; g\u00fcvenli, konforlu ve s\u00fcrd\u00fcr\u00fclebilir ula\u015f\u0131m altyap\u0131lar\u0131 olu\u015fturmak. Fethiye\u2013\u00d6l\u00fcdeniz yolu, kentimizin hem turizm hem de g\u00fcnl\u00fck ya\u015fam a\u00e7\u0131s\u0131ndan en yo\u011fun g\u00fczerg\u00e2hlar\u0131ndan biri. Bu nedenle bu hatt\u0131, b\u00f6lgenin ya\u015fam kalitesini y\u00fckselten b\u00fct\u00fcnc\u00fcl bir d\u00f6n\u00fc\u015f\u00fcm projesi olarak ele ald\u0131k.<\/p>\n<p>328 milyon TL\u2019lik yat\u0131r\u0131mla hayata ge\u00e7irdi\u011fimiz bu projede yol, i\u00e7me suyu, ya\u011fmur suyu ve \u00e7evre d\u00fczenlemelerini bir arada planlayarak uzun y\u0131llar sorunsuz hizmet verecek g\u00fc\u00e7l\u00fc bir altyap\u0131 olu\u015fturuyoruz. Mu\u011fla\u2019n\u0131n her k\u00f6\u015fesinde oldu\u011fu gibi Fethiye\u2019de de halk\u0131m\u0131z\u0131n ihtiya\u00e7lar\u0131n\u0131 \u00f6nceleyen, do\u011faya ve kent dokusuna duyarl\u0131 projeler \u00fcretmeye devam edece\u011fiz.\u201d<\/p>\n<p>Mu\u011fla genelindeki yol yat\u0131r\u0131mlar\u0131na da de\u011finen Ba\u015fkan Aras, \u201c2025 y\u0131l\u0131nda 2 milyar 86 milyon TL\u2019lik yat\u0131r\u0131mla 236 bin 800 metre yeni yol yap\u0131m\u0131 ile 440 bin metre yol bak\u0131m ve onar\u0131m \u00e7al\u0131\u015fmas\u0131n\u0131 tamamlad\u0131k. 2026 y\u0131l\u0131nda ise 4 milyar 150 milyon TL\u2019lik b\u00fct\u00e7eyle 521 bin metrenin \u00fczerinde yol \u00e7al\u0131\u015fmas\u0131n\u0131 hayata ge\u00e7irmeyi planl\u0131yoruz\u201d dedi.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi, Fethiye-\u00d6l\u00fcdeniz yolunda 328 milyon TL\u2019lik yat\u0131r\u0131mla y\u00fcr\u00fctt\u00fc\u011f\u00fc yol ve altyap\u0131 \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda ikinci etap Ovac\u0131k\u2013\u015fehir i\u00e7i g\u00fczerg\u00e2h\u0131nda \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi\u2019nin Fethiye\u2013\u00d6l\u00fcdeniz b\u00f6lgesinde ba\u015flatt\u0131\u011f\u0131 yol, altyap\u0131 ve \u00e7evre d\u00fczenleme \u00e7al\u0131\u015fmalar\u0131, b\u00f6lgede b\u00fcy\u00fck bir d\u00f6n\u00fc\u015f\u00fcmle devam ediyor. 328 milyon TL\u2019lik yat\u0131r\u0131mla y\u00fcr\u00fct\u00fclen \u00e7al\u0131\u015fmalar kapsam\u0131nda birinci etap Patlang\u0131\u00e7\u2013Ovac\u0131k, \u00fc\u00e7\u00fcnc\u00fc etap Hisar\u00f6n\u00fc\u2013\u00d6l\u00fcdeniz ve d\u00f6rd\u00fcnc\u00fc &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[1191,1898,85,341],"class_list":["post-51432","post","type-post","status-publish","format-standard","","category-genel","tag-ayyildiz-gundem","tag-etap","tag-fethiye","tag-yol"],"_links":{"self":[{"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/posts\/51432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/comments?post=51432"}],"version-history":[{"count":1,"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/posts\/51432\/revisions"}],"predecessor-version":[{"id":51434,"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/posts\/51432\/revisions\/51434"}],"wp:attachment":[{"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/media?parent=51432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/categories?post=51432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ayyildizgundem.net\/index.php\/wp-json\/wp\/v2\/tags?post=51432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}